It's time for another update!
I've been working in the new room for two weeks now, and while there's still a lot of cosmetic work to do (including painting), and the cabling is not a 100% done yet, things are beginning to look quite good and I'm able to work.
The first attended session in this room was today, and it's always great to meet new people. The next attended ones are on Saturday and Tuesday, so I'm not even near going crazy from being alone in the room all day.
Aside from the cosmetic work, I'm really going to need to figure out the lights, as I'm not at all happy with them. I have a lot of nice things planned - small spots behind the speakers, pointing upwards, separate, hidden lights for the shelves on the back..
I've really just been sitting down in the room and getting a good feel of what I really want. The same thing with cosmetic stuff, really.
Sorry for the blurry pictures! I ain't much of a photographer, and now that the bright construction lights are gone, the shutter times went over the roof and my poor hand just can't keep it steady.
I'm getting a professional photographer here, and also having a new website made. Probably in March or so.

So, the 32" LCD screen is there, I love it. Much better than having a smaller monitor closer to you. On the right you can see my old DAW - I keep it there because I have a couple of projects I'm revisiting soon, and it's just much easier to run them from the old DAW. The machine room needs a shelving system, right now all I have there is my new DAW and an UPS on top of it.

How do you like my new desk? I think it's gorgeous, the guy who did it did a really good job. I didn't go for a Sterling Modular Plan A, because the stock models are just too damned chunky for me. I want space for my feet under the desk, and I love some rounder shapes, too.
I could have ordered a custom desk (like Darius did), but since this desk costed about the same as the stock Plan A would have, I saw no reason in that.

Yep, the front end feels really spacey, even if the angled ceiling is pretty low at the very front of the room.


I have some rack space in the back, mostly for PSU's. The only thing there is my 4-channel Jung regulator PSU. Two channels for the Barry Porter EQ and one for the Foote Control Systems P3SL.
The power cable mess is very much temporary. My Furman P-1400 AR-E isn't installed yet. There's also going to be an outlet on the floor for the desk.

The right speaker and the studio mascot.. I really wish to have my Sound Anchors here soon.
I really, really love how the whole system works, the room and the speakers. They tell me exactly what I want, and the jobs I've done in the new room have went really well. They're also fun to listen to - and now a bright sounding record or a midrange poke doesn't piss me off (like it did in the old place), now I just hear what it sounds like.
The speakers are very dynamic and reveal compression and sibilance problems well. I'm really picky with compression and need to hear everything. EQ adjustments feel easy, too.

Blurry photo of what I have in there right now.
Left, from bottom to top: Barry Porter EQ - Knif Audio Pure Mu compessor - FCS P3SL compressor (prototype) - Gyraf Audio G10 compressor (very early prototype I put together in 2003 or so).
Right, from bottom to top: Passive transfer console - LCEQ, a passive EQ with tube gain make-up - Crane Song HEDD192 - Weiss DAC2.
There's going to be a few changes:
The passive console is going to be replaced really soon. I have all the parts, just need to design the front panels and order. It's going to be a little simpler - a 2k5 bridged-T Shallco/Marchand attenuator for monitor volume, monitor/process source selectors, dim/mute/mono -switch, three inserts (the current one has 6). 4HE, and as you can see, the space is already reserved.
There are going to be two Weston model 862 VU meters, right now I'm thinking of putting them next to the Weiss DAC2 and angle them properly for a good vision. They fit that space well, tried & tested.
A 2HE tranny box.. Got all the parts already.
The LCEQ will get an external power supply. The mains transformer has developed a slight mechanical hum, and tightening the lams didn't work. This will also move the power switch to an easier location.
I really need a 3rd EQ, a simple one. The BAX EQ is cool, but I can't resist designing an EQ of my own. It might be all passive, not sure yet.
As you can see, it's a simple set-up, and I have no plans to collect too many more compressors & EQ's. I like simplicity.

The back side.. I'm still negotiating with my wife about that trunk, which belonged to her great grandmother. I believe that's about the right location for it, but she begs to differ.

There's a Studer B67 MKII. Don't use it much to tell you the truth. The ugly frame was custom made for the Finnish National Radio (YLE). I need to do something about it, because it rings like a bell sometimes.

I got the ceiling things finished.