R/E/P > Budget? Budget? We Don't Got No Steekin' Budjet

The renovation from hell. Pics updated 10.25.07

<< < (2/36) > >>

Tidewater:
I got the bleeding stopped, mostly, and I was thinking I might be able to get the iso ceilings figured out tonight..




M

floodstage:
Fibes wrote on Mon, 03 April 2006 13:03
Phase two is installing a new ceiling, new bass trapping, new console, rewiring and bamboo flooring in the control room.



What's the new (or new to you) console?

Fibes:
floodstage wrote on Mon, 03 April 2006 20:20
Fibes wrote on Mon, 03 April 2006 13:03
Phase two is installing a new ceiling, new bass trapping, new console, rewiring and bamboo flooring in the control room.



What's the new (or new to you) console?


I've designed a custom console that will accept one of a few options but for now the new console will be none. Phase three will be a new board and currently the options are: The new Toft  as of yet to be built, a modular API, Tonelux or something that might happen to be the right deal at the right time. I'm actually just glad to be rid of the current Mackie which is really just a cumbersome headphone mixer and talkback device.  

rankus:


Pictures... Bump!

(We want to see Miles bleeding)

Fibes:
Here's an out of focus before pic of the tracking room.



and one of "the Fibes."




Note the drop ceiling, blood red walls and nasty carpet.
Here's a pic of Miles' leg:





I'm bringin the camera back tonite for "we're too deep to turn back" photos.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version